ABS HOME
ABS HOME
ABS HOME
Search

       Products & ServicesOffshore • E-News
Seminar Info Visit LNG 14 Web Site

Stories Team Subscribe Contact Archive

A Publication of the ABS Offshore Project Development Team

MURPHY OIL'S MEDUSA TOPSIDE IS LIFTED OFF THE I-600

urphy Oil’s Medusa topside is lifted and set on the Spar late May. To be
ABS-classed as an XA1 Floating Offshore Installation, the Medusa truss spar will be located in the Gulf of Mexico on Mississippi Canyon Block 582 in around 2,200 feet of water. Murphy Oil holds a 60 percent operating interest; other interest holders include Agip Petroleum and Callon Petroleum.

ABS is providing classification services and facilitating fast-track fabrication and installation schedules. The sixth truss spar to be installed in the Gulf, Medusa will be of similar size to the Boomvang and Nansen projects.

 

 




Copyright 2004 ] American Bureau of Shipping. All rights reserved. Terms of Use

Directory Contact Us Links Site Map